Concrete bath mix plant is the equipment used in building and road construction, its capacity is 25-180m3/h, which can meet the requirement of large, medium and small projects. The installation is the premise of normal work of concrete batching mixing plant, so professional concrete batching plant manufacturers usually supply installation and debug service.
How to install the main components of a concrete mixing plant? The specific operations are as follows:
1, Installation of belt conveyor.
The belt conveyor is unfolded from the bend place, the rear frame is placed on the foundation, the front and rear frames are connected, and the front and rear legs are connected with the conveyor. The diagonal support is connected with the lifting lugs on the frame. Then, lift the front of the conveyor, connect the front and rear legs and the diagonal braces, and finally tighten the anchor bolts of the front and rear legs.
2, Installation of the concrete mixer and the batching system.
Lift the mainframe frame and place it on the foundation to fasten its anchor bolts. The installation of the hopper of the concrete batch plant will lift the finished storage hopper, stand up the legs, and connect the walking platform and the ladder with the finished material storage hopper. Installation of the concrete batching machine, lifting the concrete batching machine on the basis, connecting the plug-in board, connecting the two sides of the heightening board to the plug-in board, and then unfolding the belt conveyor, before and after rack are connected so that the drum motor is aligned with the center of the concrete mixer head cover and the anchor bolts are finally tightened.
3, Installation of cement silo.
The components of the cement silo are assembled one by one on the ground, the cement silo is lifted, and the lower cross-support side of the lower silo bracket is oriented toward the powder batching system, the upper and lower silos are fixed, and the anchor bolts are finally fixed. Installation of the screw conveyor of the concrete batch mix plant, lifting the screw conveyor, connecting the screw joint of the screw conveyor to the discharge port of the cement silo, so that the discharge port is aligned with the feed port of the powder hopper, and then the conveyor and the cement silo hooks are connected with the steel wire rope. The anchor bolts are finally fixed. Then lifts the water pump in a suitable position and connects the output water pipes. The air compressor is placed on the side of the finished hopper. The air compressor outlet is connected with the air control box inlet by the air pipe, and the air control box outlet is led to the gas pipe of the cement silo to be connected.