When you select a concrete batch plant site, should ensure the site distance from the quarry and sand plant to close, ensuring adequate water, and away from populated areas. If you can take full advantage of the hillside terrain, the field is set in the hillside on a higher plane, can reduce machine feeding height, loader feed little or no climbing ramp angle, which can save energy and reduce wear. Equipment installation should be careful to avoid ground and underground cable, power or communication cable. Determine a reasonable device configuration. Selects the best of the three, aggregate supply mode loader feed.
Selection of mixing station for road construction (short, move, move frequently), then to use packaged, modular structure of the mixing station. Selection of belt conveyor with four, aggregate, such as spacious, selecting small inclination of 18 °, flat belt conveyer (order to reduce purchasing costs, raise the hopper can also be chosen). If space is limited, consider big angle (typically 40 ° ~50 °) sidewall belt conveyor (with attached belt structure, up to 90 °). But in the sand moist environments, ribs with large inclination belt conveyor viscous sand weakness, return belt, belt sand below is quite severe, utilization factors for a product to consider concrete sand. Five aggregate batching machine (scale) of choice
Concrete mixing station of a complete aggregate balance accumulated measured time is 1 scale, for 2~4 a separate metering scale. For each aggregate guarantee a sufficient amount of storage, and can be designed into each aggregate 2-scale material Proportioning.
If the construction requirements are low, use 2 kinds of aggregate cumulative measurement of ingredients; if the project has special requirements, you must use 3 or 4 kinds of aggregate balance accumulated measured ingredients, or even a separate measurement of each aggregate batching machine.
Copyright Haomei machinery equipment CO., LTD. all rights reserved. Sitemap Product Index Technical Support: HAOMEI