Skip type concrete mixing plant supplier sell high quality concrete mixing plant with hopper lifting device for aggregate lifting. Skip hopper type is another kind of aggregate lifting method compared with belt conveyor type, it’s characteristics are particularly obvious, which greatly reduces the space occupied by the concrete mixing itself, and also makes the construction easier. As for the work efficiency problem, it is ultimately necessary to look at the working ability of the equipment operation itself. The skip hopper for the concrete mixing plant raises 0.5 meters height per second, which can quickly raise the aggregate to the concrete mixer. It effectively compensates for the shortcomings such as slow improvement of traditional hopper hoist aggregates.
skip type concrete mixing plant supplier
Professional skip type concrete mixing plant supplier do not only offer high performance concrete plant, but also supply the maintenance and checklist for the skip hopper. The skip hopper hoist needs to be commissioned during the formal work. It can be put into use after fully complying with the working condition of the skip type concrete mixing plant. First of all, in the initial stage of commissioning, the upper and lower positions of the lifting hopper are determined. It is best not to let the wire rope loose at the lowest point of the hopper falling. The wire rope is tensioned throughout the whole process, and the lifting to the highest position allows the aggregate to be poured into the mixing drum. After the determination is completed, the double limit protection is set. Before use, check whether the connecting bolt of the limit is loose. Manually raise and lower the raw hopper before each official operation to determine whether the limit switch is reliable. The general rule is to check the double limit protection once a day and check the limit protection once a week.

Regarding the refueling of the hopper hoist reducer, the first refueling is after 500h, the oil is cleaned, and new oil is replaced. The second replacement is after 1000~2000h, and then the lubricating oil is replaced every 2000 hours. If the working condition is bad, especially the low temperature and dust environment, skip type concrete mixing plant supplier suggest that the oil change time should be shortened according to the situation. During operation, the oil level of the reducer must be within a reasonable range, it should not be too much or too little. After each accidental shutdown or overhaul, it must be re-installed. The rotation direction and upper and lower limits of the lifting hopper are circled to ensure that the hopper works normally.
Your name :
Your tel :
* Your mail :
Your company :
Your country :
* Inquiry :

Pre:上一篇:Management control of precast concrete plant for sale

Next:下一篇:Establishing a skid type batching plant